Team | Year | Pos | G | IP | PO | A | E | Fld % | RF | Eff | ZR |
---|---|---|---|---|---|---|---|---|---|---|---|
Put-In-Bay - SA
PIB - SA
|
2055 | P | 9 | 58.1 | 2 | 4 | 0 | 1.000 | 0.93 | 1.008 | -0.17 |
Put-In-Bay - SA
PIB - SA
|
2054 | P | 21 | 136.0 | 3 | 15 | 1 | .947 | 1.19 | .982 | -1.63 |
Put-In-Bay - SA
PIB - SA
|
2053 | P | 6 | 39.2 | 2 | 2 | 0 | 1.000 | 0.91 | 1.027 | -1.14 |
Total | P | 36 | 234.0 | 7 | 21 | 1 | -2.93 |